COORDINATED DELIVERY

From definition to operational handover

Hardware, software, spatial interfaces, installation and acceptance are coordinated through one delivery model.

DELIVERY RESPONSIBILITY

From definition to a clear handover.

Delivery builds and commissions the system. NORYEAN Care takes responsibility for what follows.

  1. 01

    Define

    Confirm space conditions, objectives and responsibility boundaries

    Confirmed scope
  2. 02

    Configure

    Set endpoints, networks, spatial information, interactive content and interfaces

    Implementable configuration
  3. 03

    Coordinate

    Align architecture, interiors, electrical, network, manufacturing and software

    Clear site ownership
  4. 04

    Deploy

    Install, commission wayfinding and interaction, test and accept

    Operational site system
  5. 05

    Handover

    Transfer asset records, permissions, status baseline, training and service access

    Ready for care
DELIVERYBuild and acceptance
HANDOVERRecords · Permissions · Baseline · Training
NORYEAN CAREMonitor · Support · Respond · Maintain · Lifecycle
LONG-TERM OPERATIONVisible status and traceable responsibility
TRACEABLE DELIVERY

From definition to a clear handover.

01

Survey record

Space, positions, network, power and construction conditions

02

Interface matrix

Architecture, interiors, network, software and device ownership

03

Change record

Scope, configuration, programme and approval

04

Test report

Installation, connectivity, content and device status

05

Acceptance record

Closed issues, accepted results and open items

06

Asset register

Identity, location, configuration, warranty and baseline

07

Service handover

Permissions, training, support entry and maintenance standard

Move from delivery into continuing responsibility

Explore NORYEAN Care